S.D. Highway 15 Reopening to Traffic Near Clear Lake
For Immediate Release:
Thursday, Nov.21, 2024
Contact:
Bryce R. Olson PE, Engineer IV, 605-882-5166
CLEAR LAKE, S.D. – Grading work on S.D. Highway 15, south of Clear Lake to S.D. Highway 28, has been completed and will be fully reopened to through traffic by Saturday, Nov. 23, 2024. Motorists should be aware that a portion of the project roadway is a treated temporary gravel surface and extra care will be needed when driving due to possible loose gravel. A lower posted speed of 45 mph will be in place through the gravel section. Final clean-up work on Highway 15 will be completed as weather allows in the coming weeks.
The $11.5 million project reconstructed 12 miles of Highway 15 from Clear Lake south to Highway 28 and included grading, structure work, and interim surfacing.
Permanent asphalt paving for the project is scheduled for 2025.
About SDDOT:
The mission of the South Dakota Department of Transportation is to provide a safe and efficient public transportation system.
For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.
Read more about the innovative work of the SDDOT at https://dot.sd.gov.
-30-
Distribution channels:
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.
Submit your press release